Mapletide: More Inspection Hours, Less Revenue

Mapletide Engineering Inspection

Questions: 7 Answered:

Opens full screen, like the exam.

Question of 7 Mapletide: More Inspection Hours, Less Revenue
Mapletide: More Inspection Hours, Less Revenue Case-based question
The case

Mapletide provides engineering inspections to commercial property owners. Team leaders negotiate hourly fees within approved limits. At the start of the year, Mapletide budgeted 7,200 billable hours at an average fee of $180 per hour. Actual activity was 7,500 billable hours at an average fee of $172.

Budgeted variable operating cost was $36 per billable hour. Actual variable operating cost was $277,500. Managers are investigating why increased billable activity did not produce the planned revenue.

Assumptions

  • Use billable hours as the sole activity driver; mix effects are outside this case.
  • Original prices and cost rates remain the standards when constructing the flexible budget.
  • Revenue variances are actual minus budget: positive is favorable and negative is unfavorable.
  • Expense variances are actual minus budget: positive is unfavorable and negative is favorable.
  • All expense questions concern variable costs only and remain within the relevant range.

What is Mapletide's actual revenue variance from its original annual revenue budget?

Answer
The original-to-actual revenue comparison includes both fee and Other effect in the static variance effects. A flexible budget substitutes actual Variable updated in the flexible budget while retaining the original fee. Mapletide's flexible budget revenue variance is Flexible budget revenue variance , attributable to its Source of the flexible revenue variance .

In a separate scenario, suppose Mapletide billed exactly 7,200 hours but still earned an average fee of $172 rather than the $180 standard. What would the flexible budget revenue variance be? Enter whole dollars rounded to the nearest dollar; positive means favorable and negative means unfavorable.

USD

A whole number. A negative amount may be written with a minus sign or in brackets.

Using the actual annual results in the scenario, calculate Mapletide's revenue volume variance (the change in billable hours valued at the budgeted fee). Enter whole dollars rounded to the nearest dollar; positive means favorable and negative means unfavorable.

USD

A whole number. A negative amount may be written with a minus sign or in brackets.

Calculate actual variable operating cost minus the original static variable cost budget. Enter whole dollars rounded to the nearest dollar; use positive for unfavorable cost and negative for favorable cost.

USD

A whole number. A negative amount may be written with a minus sign or in brackets.

Which TWO statements correctly explain Mapletide's actual variable cost results? Select exactly TWO.

Select two answers. Selected 0 / 2

Answer

Why is a flexible budget especially useful in Mapletide's review of team leaders?

Answer