Aeris: Learning Standards for Mapping Pods
Aeris Survey Robotics
Opens full screen, like the exam.
Aeris has accepted a contract for eight identical underwater mapping pods. The first completed pod required 240 direct labor hours. Engineering estimates an 85% cumulative-average learning curve across the first eight pods. Every doubling of cumulative output reduces average labor hours per pod to 85% of the previous average.
The production coordinator proposed budgeting all eight pods at the first-pod time, despite receiving engineering's estimate. The eight pods were completed using 1,260 direct labor hours at a total labor cost of $52,920. The approved standard labor rate is $40 per hour. There were no overtime premiums or changes in product specifications.
Assumptions
- The cumulative-average model applies to all eight pods, including the first pod.
- Use three doublings from one to eight pods. Keep unrounded learning estimates through each calculation.
- For labor cost variances, actual minus standard is the sign convention: a positive amount is unfavorable and a negative amount is favorable.
- The learning estimate is a planning assumption, not a guarantee of realized productivity.
Using the 85% cumulative-average learning model, how many total direct labor hours should Aeris budget for the first eight pods? Enter hours rounded to two decimal places.
To 2 decimal places.
What average labor time per pod does the 85% learning model predict once the first eight pods are complete? Enter hours per pod rounded to two decimal places.
To 2 decimal places.
Calculate the labor efficiency variance against the coordinator's proposed standard of 240 hours for each of eight pods. Use the $40 standard rate. Enter whole dollars rounded to the nearest dollar, with positive for unfavorable and negative for favorable.
A whole number. A negative amount may be written with a minus sign or in brackets.
Calculate the labor efficiency variance using engineering's 85% learning estimate for all eight pods. Retain unrounded standard hours and enter dollars rounded to two decimal places, with positive for unfavorable and negative for favorable.
To 2 decimal places. A negative amount may be written with a minus sign or in brackets.
If the coordinator deliberately omits a credible learning estimate to make the labor target easier, which TWO consequences could result? Select exactly TWO.
Select two answers. Selected 0 / 2